Projects
Storage Dashboard
55.1%
1 projectGFRC: 23 KBTotal: 2819 / 5,000 KBProject Hub: 2417KB · Fencing: 373KB · Stairs: 5KB
+ New Project
Start From
🧠 Smart Estimate
Answer 4 questions. The estimator matches your job against every completed benchmark and pre-fills all values based on what we've learned.
Project Name
General Contractor
Location
Estimated Square Footage
Estimated Panel Count
1. Scope — Who supplies the panels?
2. Steel Finish on Structural Steel
3. Job Location Type
4. Connection Details Status
Record Outcome
Record whether this bid was won or lost. This data feeds the Smart Estimate engine and helps calibrate future pricing.
Actual Final Value ($) — if different from estimate
What did we learn?
JHA
GFRC ESTIMATOR v0.21.1
125%
🔒 ESTIMATE LOCKED — New Revision to edit
Panel Scope
Total Square Footage
SF
Est. Panel Count
ct
Small Panels
ct
Large Panels
ct
GFRC Material
Material Cost / SFf(x)
Revenue = sqft × cost/SF × (1 + tax%) ÷ (1 − margin%)
Your raw panel cost per SF from the SLC supplier. Multiplied by total SF then grossed up for sales tax and marked up through material margin to get your charge.
$
Sales Tax
%
Material Marginf(x)
Material Revenue = matCost ÷ (1 − margin%)
Tulsa used 9% on high-volume SLC supplier panels. AK was 0% (install-only, no panels). Lower margin on materials is offset by higher install margin.
%
Hardware
Hardware Cost / SF
$
Hardware Marginf(x)
Hardware Revenue = hwCost/SF × sqft ÷ (1 − margin%)
Use 35% when connections are TBD — protects against scope growth when the structural drawings are not yet finalized. Drop to 25% once connection details are confirmed.
%
GFRC Estimator
ESTIMATE TOTAL
$22,656
15.2% core margin · $2,856 core profit
✏️ Est #1